The team has taken component in the producing and revising of ISO/TC100 international chain common several several years in success and hosted the 16th ISO/TC100 Intercontinental yearly meeting in 2004. We inspect every piece of bearing by ourselves just before supply. Total use has been created of all kinds of sophisticated tactics and engineering to reach excelsior production. Major Characteristic:
1.EPTT EPTT,eight 2 data files
2.EPTT steering
three.ten inch single action clutch
4.540/720 EPTT output
5.EPTT stress elevate
six.The entrance and rear flat tires are 6.5-16/eleven.2-24
seven.With weigEPTT and security rack
Principal EPTT Parameters:
the primary technological performance indicators | ||
Design No. | 604 | |
Technique | four Wheel type | |
Use | Multi transportation | |
Demension | mm | 3686*1511*2212 |
Distance of Bear | mm | 1962 |
Distance of wheel(Front wheel/Again wheel) | mm | 960,1100,1245,1300/960-1300 |
Length of wheel(entrance wheel/again wheel)Adjustment | mm | 960,1100,1245,1300/960-1300 |
Min excess weight | kg | 1650 |
Entrance bear bodyweight/back bear excess weight | kg | 740/910 |
Max match weight(entrance/back again) | kg | forty two/sixty |
Gear shaft | eight two | |
Engine design | 4TE50 | |
Motor voltage | kW | 44.1 |
Buyer Visit:
Manufacturing facility Images:
Pre-EPTT Services:
one. Inquiry and consulting assistance
two. Sample testing support
three. View our Factory
Right after-EPTT Support:
1.shell out the double air tickets, lodging and foods. Our technicists can assist you in neighborhood location
2.According to the necessity of the consumer, our business sends engineers for installation and commissioning in buyer’s web site incXiHu (West Lake) Dis.Hu (West Lake) Dis. the education of capabilities of buyer’s personnel on operation, upkeep, etc.
3.EPTT the answers for diverse farming surroundings.
four. For the injury brought on by the end users, our firm offers the components and add-ons with EPTT price.
five. Our manufacturing unit materials the wearing elements with the EPTT value to clients.
Bundle ampEPTT:
EPTT will be concluded in fifteen-twenty working daEPTTafter payment. It relies upon on your orEPTTquantity. And the shipping and delivery time to the port is about one-two days.